Prestigious Projects |
|
Sr.no. |
Client Name |
Description |
Value in Rs. |
1 |
TATA Power Ltd. - Mumbai |
LT Distribution & Metering work, including erection of 30 MVA Transformer. |
8 Cr |
2 |
Torrent Power Ltd. - Bhiwandi |
Repair and Maintenance of 22 kV Overhead lines. |
6 Cr |
3 |
TATA Power Ltd. - Trombay |
Supply of Electrical equipments for Cooling water at Trombay thermal station. |
3.5 Cr |
4 |
New Delhi Power Ltd. |
Electrification of High voltage Distribution System, Overhead Lines and Underground Cables. |
3 Cr |
5 |
Reliance Energy Ltd. - Delhi |
Erection, Testing and Commissioning of High Voltage Distribution System. |
1 Cr |
6 |
Reliance Industries Ltd. - Koparkhairane |
22/11/0.433 KV Substation Electrical work for Residential Complex at Beverly. |
88 Lac |
7 |
Torrent Power Ltd. - Ahmedabad |
Installation, Testing and Commissioning of 65 MVA, 132/33/11 kV and 30 MVA and 50 MVA Transformer Substations. |
1.4 Cr |
8 |
Crown Worldwide Movers - Taloja |
A warehouse facility for Media Documents on Godrej 7 Floor Racking system. Scope includes Supply, Installation, Testing and Commissioning of 500 kVA Transformer, LT Panels, DBs, Lighting Fixtures, Earthing etc. |
70 Lac |
9 |
New Delhi Power Ltd. |
Replacement and Erection, Testing and Commissioning 20 MVA Transformers |
48 Lac |
10 |
Deepak Fertilizers and Petrochemicals Corporation Ltd. |
Erection, Testing and Commissioning of 22 kV HT Panel, HT Cable laying up to 4.7 km. |
89 Lac |
Sr.no. |
Client Name |
Description |
Value in Rs. |
1 |
Torrent Power Ltd. - Agra |
Repair and Maintenance of 11/33 kV Overhead lines. |
1.5 Cr |
2 |
DHL Lemuir Logistics Pvt. Ltd.
Padgha-Bhiwandi |
Complete electrification work of Warehouse and allied works which includes Supply Installation Testing & Commissioning Cables, Cable Trays & Support systems, Light Fixtures, Street Lighting, Ashlok Earthing system, Lighting arrestors, Servo Controlled Stabilizers & Inverter, Panels, DB’s, etc. (Area: 1 Lakh Sq. ft.) |
1.1 Cr |
3 |
Loha Ispaat Ltd.
Khalapur |
Complete electrification work for 22 kV HT Line (7 km) Electrical execution work at Uint -1 (Khalapur) for Power Enhancement also includes Liasoning work with PWD & Load Sanctioning firm MSEDCL complete. |
81 Lakhs |
4 |
Torrent Power Ltd. - Dahej |
Installation, Testing and Commissioning of 20 MVA, 33/11 kV Transformer Substation. (2 Nos.) |
15.38 Lakhs |
5 |
Steelman Building at Ranade Road Junction, Dadar |
Complete Desiging & Commissioning of Electrical System from transformer, Metering, Earthing, House wiring, Lighting, Telephone system Shop + 22 storied Building with 4 levels of parking |
80 Lakhs |
|
Power Projects in details |
Sr.no. |
Client Name |
Description |
Area |
Value in Rs. |
1 |
M/s. Tata Power Co. Ltd. |
LT Distribution & Metering work covering entire Mumbai Region, Khopoli, Bhivpuri, Bhira, Mulshi etc. The job includes 22KV/ 433 V, Indoor, Outdoor Substations- Erection of transformers, ranging from 300 KVA to 30 MVA of all types & capacities erection of RMU’s ,Earthing system, H.T. / L.T. switchgear panels, lightning, Cable laying, including excavation etc, jointing & termination, erection of H frame made of G.I/M.S, G.O.D, D.O.S. etc. feeder pillar erection, design, distribution & liasion work . |
Mumbai Region |
More than Rs. 8 Crores
(Since 1995 – till date) |
2 |
M/s. North Delhi Power Ltd. |
RMU installation, High voltage 11 KV AB cable laying with overhead transmission cables, with the help of no of poles erection, earthing system, pole mounted transformers of various capacities, cable terminations, jointing etc. along with carrying out survey to reduce losses and theft during transmission of power, complete with Testing & Commissioning. Erection of 66 KV grid substations in complete Delhi Region which includes structural steel towers, Civil foundations for different equipments such as L.A’s GO.D’s, Neutral C.T’s Transformers of capacity of 30 MVA, Control cable laying through RCC trenches etc. and liason work with P.W.D& electrical inspector etc. complete with testing & commissioning. |
Delhi Region |
More than Rs.3 Crores
(2007) |
3 |
M/s Reliance Energy Ltd |
Complete high voltage distribution networking system in Delhi to reduce the losses & theft during transmission. The job includes survey, preparation of drawings, and erection of poles to mount various sizes of transformers ranging from 10KVA to 250KVA, Earhing system, Laying of 11 KV high voltage AB cables mounted on poles, jointing, termination of cable, testing & commissioning etc. |
Delhi |
More than Rs. 100 Lakhs
(Since 2004 till Date) |
4 |
M/s. Reliance Engineering Associate Pvt. Ltd. |
Designing, distribution of various systems such as Lighting, Air-conditioning, Telephone, Computer, UPS, LAN, D.G. Sets of different sizes from 50 KVA to 250 KVA, Earthing system, liaison work, testing & commissioning complete. |
Maharashtra Circle |
More than Rs. 50 Lakhs.
(2002-2005 |
5 |
M/s. Torrent Power Ltd. |
Refurbishment & Revamping of Transformer Substation from 100 KVA to 750 KVA Replacement of transformers, earthing system, Cable laying, feeder pillar installation etc. Checking working of all protection systems. Such as LAs, GODs etc. Revamping of HT/LT overhead transmission lines. This includes replacement of conductors with higher size, hardware, insulators & installation of additional poles resagging of conductors etc. |
Bhiwandi Circle |
More than Rs. 6 Cr
(2007 till date) |
6 |
M/s. Reliance Industries Ltd. |
Installation, Testing & Commissioning of Indoor substation 2 Nos. consisting of 1600 KVA 11KV/433V transformer 2 Nos. & 500 KVA 11KV/433V1 No. with HT indoor SF6 CB & 30V 150 VA battery charger. |
Koparkhairane |
Rs. 88 Lakhs |
7 |
M/s. Tata Power Co. Ltd. |
Complete designing, supply and execution of 400 KVA, 6.6KV/ 433V transformer, 6.6KV HT isolator, complete supply & installation of M.S. structure support for laying of G.I. cable trays & 6.6KV, 6 Kms. HT cable from control room to pump room substation including earthing systems and various control systems for their cooling water system plant at unit 8, Trombay generating station. |
Trombay
Unit 8 |
More than Rs. 350 Lakhs |
8 |
M/s. Om Vishwakarma Pvt. Ltd. |
Complete designing, supply and execution testing & commissioning of various equipments, Such as transformer, panels, D.Bs, machines etc. including lighting system & allied systems such as telephone data network etc & earthing systems complete |
Umbargaon, Gujarat |
More than Rs. 20 Lakhs |
9 |
M/s. Guarniflon India Pvt. Ltd. |
Designing, of various systems. 1000 KVA transformer, H.T substation, LT panels, DBs, cable trays, earthing system, cables, lighting system, lighting fixtures, power distribution to various machines complete testing & commissioning. |
|
More than Rs.90 Lakhs |
10 |
M/s. Fashion Forecast |
Complete designing & supply, execution, testing & commissioning of various machines, lighting, H.T substation, metering Kiosk, transformers, earthing, Air-conditioning, data network etc |
Palghar |
More than Rs. 20 Lakhs |
11 |
M/s. Torrent Power Ltd. |
Installation work of switchyard electrical equipments for 30 MVA/132/11 KV, 65MVA/132/33 KV transformers at various substations. |
Ahmedabad |
More than Rs.75 Lakhs
(2008 till date) |
12 |
M/s. Crown worldwide Movers Pvt. Ltd. |
Complete supply and installation of 500 KVA transformer substation, LT panels, DBs, cable trays, earthing system, cables, lighting system, lighting fixtures, power distribution, A.C power etc. |
Taloja MIDC |
Rs. 70 Lakhs
(2008-09) |
13 |
M/s. Torrent Power Ltd. |
Installation, Testing and Commissioning of 15 MVA, 66/11 kV Transformer Substation |
Dahej |
20 Lakhs
(2009) |
14 |
M/s. Torrent Pharmaceutical Ltd |
Supply, Installation, Testing and Commissioning of PDBs, Cables , Flameproof accessories and Installation of LV Switchgear, UPS etc. |
Ahmedabad |
80 Lakhs
(2009-10) |
15 |
M/s. Deepak Fertilizers and Petrochemicals Corporation Ltd. |
Erection, Testing and Commissioning of 22 kV Main Receiving Substation and Liasoning of 410 MVA load. |
Taloja MIDC |
89 Lakhs
(2009-10) |
16 |
M/s. Torrent Power Ltd. |
Repair and Maintenance of 11/33kV Overhead lines. |
Agra |
1.5 Cr plus
(2010) |
17 |
M/s. Metro Train Marol Naka RSS
(MMOPL) |
Installation and Commissioning of 20 MVA Traction Transformer 33/27.5KV, 33/11KV, 33 KV, 25KV GIS Panels and 11 KV Switchgear, Control cables and Power cables Laying and Termination |
Marol Andheri Mumbai |
12.35 Lakhs
(2010) |
Sr.no. |
Client Name |
Architect
Name |
Scope of work |
Area |
Value in Rs. |
1 |
ARA Properties Pune |
Architech: Ramesh Edwankar & Associates
Consultant: Vijay Joshi - Siddharth Consultant & Designers |
Complete electrification work and allied works which includes Supply Installation Testing & Commissioning of Network System, Telephone, Air Conditioning, Lighting, Electrification of Lift, Fire pump, Fire alarm system and all kind of BMS system such as CCTV, Music/PA System, Access control, Substation, DG Sets, Cable Trays, Support systems, Lighting automation, Earthing system, Lighting arrestors, Stabilizers, Panels, DB’s, Imported Fixtures, Landscape area, Basement etc. also includes Liasoning work with PWD & Load Sanctioning firm MSEDCL complete. |
1 Lakh Sq. ft. |
2 Cr plus |
2 |
L&T Pune |
|
Complete electrification work and allied works which includes Supply Installation Testing & Commissioning of Cables, Cable Trays, Support systems, Lighting automation, Earthing system, Panels, DB’s, Lighting Fixtures |
|
60 Lakhs |
3 |
Torrent Pharmaceutical Ltd.
Mehsana Express Highway, Chhatral, Tal- Kadi Ahmedabad Gujrat |
|
Complete Electrification of their API module D & E Plant. Supply Installation Testing and Commissioning of Cable tray, Support system, Earthing, lighting, Cable Laying, Termination, MCC Panels, DB, Electricals to AHU and Air conditioning System, Flameproof equipments such as Lighting system, Telephone & Industrial Sockets, Quality Control Room etc complete. |
|
80 Lac |
4 |
BARC |
|
Supply, Installation and Commissioning of Street Lighting |
|
17.7 Lac |
5 |
Kenny's International
at Brazzaville, Republic of
Congo, Central Africa |
|
Complete Designing of Electrical and Allied systems which includes 6.6/20kV, 650KVA transformer, 250KVA stabilizer, 250 KVA DG
Set, Change over panels & main panels. Meter board using main rising cables for flats & earthing system. DB's and internal wiring for lighting, air conditioning & other panels for residential area and similarly for mall area
Allied System: Telephone, internet, CCTV, TV and Cable net etc. Arranging & helping client to get appropriate vendors & working
for different electrical material like cables, wires, conduits, light fittings, panels, DG set, Stabilizer, Transformer etc. and supervision by our skilled personnel at site.
Period of work-10 months
(Area : 15,000 Sq. Feet) |
|
1.35 Cr |
6 |
Fashion Forecast |
|
Designing & supply, execution, testing & commissioning of various machines, lighting , H.T substation, metering Kiosk, transformers, earthing, Air-conditioning, data network |
|
More Than Rs. 20 Lacs
(2008) |
7 |
Crown worldwide Movers Pvt. Ltd |
|
Supply and installation of 500 KVA transformer substation, LT panels, DBs, cable trays, earthing system, cables, lighting system, lighting fixtures, power distribution, A.C power etc. |
|
70 Lacs
(2008) |
8 |
Crompton Greaves Ltd |
Raju Dhuri and Associates |
Complete Designing of Electrical system for Lighting, Air-condition, Computer LAN, & UPS systems, Telephone, Fire alarm system, Smoke Detectors, Security system such as Access control etc. |
More than 3 lakh Sq.ft. |
More Than Rs.2 Crores
(2007-2008) |
9 |
Tata Power Co. Ltd. |
Miss. J.M. Bodas |
Complete Designing of Electrical system for Lighting, Air- condition, Computer LAN, & UPS systems, Telephone, Fire alarm system, Security system such as access control etc. |
More than 2 lakh Sq.ft. area |
More Than Rs. 50 Lacs |
10 |
Mumbai District AIDS Control Society |
Mr. Pravin Kanekar & Associates |
Complete Designing of Electrical system for lighting Air-condition, Computer LAN, & UPS systems, Telephone, Fire alarm system, Smoke Detectors, Security system such as access control etc. Complete With as built drawings & liaison work for 250 KVA load. |
More than 3 acres |
More Than Rs. 25 Lacs
( 1999-2000) |
11 |
Royal Garden Resort, Vasai |
Paranjape & Deshpande And Associates |
Complete Electrical Designing along with supply & installation of Transformer, main panels, cables, earthing, wiring for lighting systems, Air Conditioning, cable T.V. telephone, LAN for computer systems, lighting fixtures etc. complete including testing and commissioning of the total job. |
|
More Than Rs. 75 Lacs
( 1997-2004) |
12 |
Vihang Club, Thane |
|
Complete Electrical System Complete wiring, cable laying for lighting, Air conditioning, data cable laying for computers, Telephone, etc. Complete electrical work for landscape, Swimming pool, Club area, Music etc. and all other systems including supply of Lighting Fixtures |
|
More Than Rs. 70 Lacs
(2006-2007) |
13 |
Abeey’s Palace, Pune |
Ramesh Edwankar & Associates |
Complete wiring / cable laying for internal palace area for lighting, Air conditioning, telephone, data cable laying for computers, automatic switching arrangement with control system. Façade & Dome lighting & complete landscape Area with swimming pool, water bodies etc. Main panels, D.B.s, cables etc. complete along with Normal & Emergency Lighting system. |
|
More Than Rs. 150 Lacs
(2008-2009) |
14 |
Epitome global Services,
Prism Towers, Malad, Mumbai. |
Premnath & Associates |
Complete wiring / cable laying The scope includes complete execution of Electrical system for Lighting, Air-condition, DATA and Voice & UPS systems, Fire alarm system, Security system such as CCTV and access control etc. |
More than 10 Thousand Sq.ft. area |
More Than Rs. 35 Lacs
( 2005-2006) |
15 |
Kale Consultants Pvt. Ltd |
Genesis & Associates |
Complete wiring / cable laying The scope includes complete execution of Electrical system for Lighting, Air-condition, DATA and Voice & UPS systems, Fire alarm system, Security system such as CCTV and access control etc. |
More than 12 Thousand Sq.ft. area |
More Than Rs. 35 Lacs
( 2005-2006) |
16 |
ITD Cementation India Ltd. |
Rajeev kasat & Associates |
Complete designing, supply & execution of Electrical system for Lighting, Air-condition, DATA and Voice & UPS systems, Fire alarm system, Security system such as CCTV and access control etc. designing & supplying of various panels & DBs, lighting fixtures and music system complete. |
More than 10 Thousand Sq.ft. area. |
More Than Rs. 27 Lacs
(2009-2010) |
17 |
L & T Finance Ltd. at Bandra Kurla Complex |
Mr. Deo (L & T) |
Complete designing, supply & execution of Electrical system for Lighting, Air-condition, DATA and Voice & UPS systems, Fire alarm system, Security system such as CCTV and access control etc. designing & supplying of various panels & DBs, lighting fixtures and music system complete. |
Entire area – 15000 Sq.ft. for 3 floors |
More Than Rs. 60 Lacs
(2006-2007) |
18 |
Spykar Jeans Pvt. Ltd. |
Paritosh Parelkar |
Complete supply & execution of various materials required for Electrical system for Lighting, Air-condition, DATA and Voice & UPS systems, Fire alarm system, Security system such as CCTV and access control etc. lighting fixtures and music system complete. |
3 floors of office premises each of size 10000 Sq.ft. |
More Than 50 Lacs
(2007-2008) |
19 |
Royal Garden Resort, Vasai. |
|
Complete designing, supply & execution of Electrical system for Lighting, Air-condition, DATA and Voice & UPS systems, Fire alarm system, Security system such as CCTV and access control etc. designing & supplying of various panels & DBs, lighting fixtures and music system complete. |
|
More Than Rs. 15 Lacs
(2004-2005) |
20 |
MAC, ESCALATOR,
CROSSWORD |
Pooja Parekh |
Complete designing, supply & execution of Electrical system for Lighting, Air-condition, DATA and Voice & UPS systems, Fire alarm system, Security system such as CCTV and access control etc. designing & supplying of various panels & DBs, lighting fixtures and music system complete. |
|
More Than Rs. 40 Lacs |
21 |
Khushlani & Asso. |
|
Complete designing & commissioning of electrical system from Transformer, Metering, Earthing, Lighting, Telephone, Cable T.V., Security Systems, etc. 4 nos. of 14 storey buildings |
4 nos. of 14 storey buildings |
More than Rs. 100 Lacs
(2005-2006) |
22 |
Nawani Construction , Khar(W), Mumbai |
|
Complete designing, liasion work, earthing, lightning, telephone, Cable T.V., Security Systems, etc. |
2 nos. of 7 storey buildings |
20Lacs
(2005-
2006) |
23 |
Richa Realtors Ltd. Mumbai (Since Year 2005-2006 Till Date) |
a |
Bakul C.H.S. Ltd
at Borivali (W.) |
|
Complete designing & commissioning of electrical system from transformer, Metering, Earthing, Lighting, Telephone, Cable T.V., Security Systems, etc |
Shop + Stilt +9 floors, 36 Nos.
2BHK flat 30,000 sq. feet. |
More Than Rs. 38 Lacs |
b |
Barkat C.H.S. Ltd.
at Prabhadevi |
Stilt + 7 floors, 7 Nos. 3BHK flats 8400 sq.feet Area. |
More Than Rs. 7 Lacs |
c |
Eastern Majestic Tower
at Mulund (W.) |
Stilt + 16 floors, 32 Nos. 2BHK flat,60 Nos. 1BHK flat 75,000 sq.feet areas. |
More Than Rs.73.5 Lacs |
d |
Central Plaza, Mumbai Central, |
Stilt + Shop + 19 storied Building
With 4 levels of parking. Total built up area of project 175,000 sq. feet |
85 Lacs |
e |
Rajpath /Eastern Tower
at Mulund (E.) |
Shops / Stilt + 15 floors, 62 Nos. 2BHK flat, 75,000 sq.feet areas. |
More Than Rs.67.5 Lacs |
24 |
Indradhanu, Housing complex, Kothrud, Pune |
|
Complete designing & commissioning electrical system from transformer, Metering, Earthing, House wiring, Lighting, Telephone |
Approximate 1.5 Lakhs Sq. Ft. 13 floors of 3 nos. of building |
More Than Rs. 85 Lacs |
|
|
|
|