List of Testing Equipments Testing facility of Power Transformer
Tools & Tackles Testing facility of Switchyard Equipment and Panels
Testing Facilities for lighting

List of Testing Equipments
 

Sr.no. Item Name Specifications
1 Variable / Auto Transformer 20 Amps  
2 HT Megger 5 kV Make CIE (Sr. No. 29514)
3 Digital Multimeter Make MECO
4 Tong Tester 2000 A Make MECO
5 Tong Tester 100 A Make MECO
6 Galvonometer  
7 Phase Sequence Meter  Make GYRO
8 CRM Contact Resistance Measurement 100 Amps  
9 Step Up Transformer 5kV  
10 5kV Motorised Megger Make CIE
11 Winding Resistance kit  
12 High Pot Kit upto 50kV  
13 Relay Test Kit Make Sudarshan ( Model : S1/CV-100, Sr. No. 04/13)
14 Transformer Oil testing kit with 2.5mm gap  
15 1000 G.P.H. high vacum filter machine  
16 Vacuum pump with complete accessories  
17 Loading Transformer 750 Amps  
 
Tools & Tackles

Sr.no. Description Quantity
1 10 T Cable Jacks with Shaft 5 Pair
2 Steel Cable Stands 5 Pairs
3 Cable Rollers 500 Nos.
4 5T Chain Pulley Block 5 No.
5 3T Turfer with wire rope 3 Nos.
6 415V, 3 PH Welding M/C 5 Nos.
7 415V, 1 PH, Welding M/C 10 Nos.
8 Hydraulic Crimping M/C 5 Nos.
9 Hand Crimping Tools 10 Nos.
10 1000v Megger 5 Nos.
11 500V Megger 10 Nos.
12 AVO/Multimeter 10 Nos.
13 Continuity Tester 12 Nos.
14 Earth Megger 5 Nos.
15 Tong/Clip-on Meter 5 Nos.
16 Elec. Drill M/C’s ¼”, ½”, 3/4” As Required
17 Elec. Blower 3 Nos.
18 Elec. Chipping M/C 3 Nos.
19 Elec. Tile Cutting 2 Nos.
20 Ladders & Scaffolding As Required
21 Crow Bars, Rollers, Manila Ropes for Material Shifting As Required
22 Bending Springs As Required
23 Electrician’s/Fitter’s/Welder’s Hand Tool kit which Will include Connectors, Screw Drivers, Spanners, of All sizes & types, Hammers, Pliers, Drill Bits, Hacksaw Frames, Right Angles, Plumb Bobs, Spirit Levels, Chisels As Required
 

Testing Facilities for lighting

Pre-installation testing facilities available:

Sr.no. Testing Carried Out For Test
1 Wire Resistance Measurement
Insulation Resistance Measurement
2 Switches & Accessories Contact Resistance Measurement
Insulation Measurement

3 Lighting Fixture & Accessories Contact Resistance Measurement
Insulation Measurement
 

Pre-commissioning testing facilities available:

Sr.no. Testing Carried Out For Test
1 Point Wiring Insulation Resistance Measurement between phases & phase & earth
2 Cables & Wires Insulation Resistance Measurement between phases & phase & earth
3 Lighting Fixture & Accessories Watt Loss Measurement Test
 

Testing facility of Power Transformer

Sr.no. Test
1 HV/ LV winding IR reading
2 Insulation resistance of HV/ LV wingings
3 PI value for one minute / 10 Sec. during filtration
4 Checking wiring of all trip / alarm functions of Transformer, OLTC & RTCC wiring
5 Inter tripping of 132 KV & 11 KV breaker
6 132 KV breaker tripping
7 Transformer Vector group
8 Magnetising current Test
9 Magnetic balace Test
10 Voltage ratio test
11 Current Ratio Test
12 O.C. Test
13 S.C test
14 Function test for OLTC with Remote panel
15 Test for all alarm / trip of Transfromer Function
16 Checking and testing of all fuction of RTCC and OLTC
17 Ambient Temperature
18 Filter M/C inlet temperature
19 Filter M/C outlet temperature
20 Transformer main tank oil temperature
 

Testing facility of Switchyard Equipment and Panels

Sr.no. Test
1 Inter panel wiring for AC/DC. Control & indication, temp, scanner etc.
2 Checking metering & back up protection ckt.
3 Primary injection of all CTs with primary injection kit.
4 Testing of relays, metering, indication, DC, AC, annunciation, temp. Scanner and its wiring.
5 Checking & testing of all functions like ON/OFF/TRIP of breakers.
6 Checking & testing of PT Circuit logic scheme
7 AC high voltage testing for busbar & breaker trolley
8 Scheme testing of REF / DIFFERNTIAL Protection as it is reconnected on new panel.
 
 